Westerly - NG WRI DG Area Study #2 <5 MW (1053)

Westerly - NG WRI DG Area Study #2 <5 MW is a 4.9 MW solar interconnection project in Washington, Rhode Island with a current status of withdrawn. It is proposed to connect at NR Westerly substation, feeder 16F2.

4.9 MWCapacity
WithdrawnStatus
RIMarket
SolarTechnology

Project facts

Canonical nameWesterly - NG WRI DG Area Study #2 <5 MW
Queue ID1053
Statuswithdrawn
Source statusW
MarketRI
TechnologySolar
Capacity4.9 MW
StateRhode Island
CountyWashington
Point of interconnectionNR Westerly substation, feeder 16F2
Requested (queue) date2020-08-19
Proposed in-service date2025-06-30
Operational date
Withdrawn date2021-09-14
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata