Wethersfield Windfield 115kV (0176)

Wethersfield Windfield 115kV is a 129.0 MW wind interconnection project in Wyoming, New York with a current status of withdrawn. It is proposed to connect at Arcade Substation 115kV.

129.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWethersfield Windfield 115kV
Queue ID0176
Statuswithdrawn
Source status0
Market
TechnologyWind
Capacity129.0 MW
StateNew York
CountyWyoming
Point of interconnectionArcade Substation 115kV
Requested (queue) date2005-02-14
Proposed in-service date2006-07-18
Operational date
Withdrawn date
DeveloperNoble Environmental Power, LLC
Utility / transmission ownerVillage of Arcade

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-28
Data last materially changed2026-08-28
Page data generated2026-08-28

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.