Wever - Burlington 161 kV (S1071)

Wever - Burlington 161 kV is a 120.0 MW generation interconnection project in Lee, Iowa with a current status of operational. It is proposed to connect at Wever - Burlington 161 kV.

120.0 MWCapacity
OperationalStatus
Market
GenerationTechnology

Project facts

Canonical nameWever - Burlington 161 kV
Queue IDS1071
Statusoperational
Source statusDone
Market
TechnologyGeneration
Capacity120.0 MW
StateIowa
CountyLee
Point of interconnectionWever - Burlington 161 kV
Requested (queue) date2024-11-15
Proposed in-service date2025-11-07
Operational date2025-11-07
Withdrawn date
Developer
Utility / transmission ownerITC MIDWEST

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata