Wever Solar (150MW) (67538_BESS1)

Wever Solar (150MW) is a 99.0 MW battery interconnection project in Lee, Iowa with a current status of operational.

99.0 MWCapacity
OperationalStatus
MISOMarket
BatteryTechnology

Project facts

Canonical nameWever Solar (150MW)
Queue ID67538_BESS1
Statusoperational
Source status(OP) Operating
MarketMISO
TechnologyBattery
Capacity99.0 MW
StateIowa
CountyLee
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2026-02-01
Withdrawn date—
Developer—
Utility / transmission ownerInterstate Power and Light Co

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata