Whale Square Energy Storage 2 (1243)

Whale Square Energy Storage 2 is a 95.7 MW battery interconnection project in Kings, New York with a current status of withdrawn. It is proposed to connect at Greenwood 138kV substation, via Feeder 23162.

95.7 MWCapacity
WithdrawnStatus
JMarket
BatteryTechnology

Project facts

Canonical nameWhale Square Energy Storage 2
Queue ID1243
Statuswithdrawn
Source status0
MarketJ
TechnologyBattery
Capacity95.7 MW
StateNew York
CountyKings
Point of interconnectionGreenwood 138kV substation, via Feeder 23162
Requested (queue) date2021-09-03
Proposed in-service date2024-05-31
Operational date
Withdrawn date
DeveloperAstoria Generating Company, L.P.
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata