Wheatland 12 kV (AE1-029)

Wheatland 12 kV is a 8.8 MW battery interconnection project in Mercer, Pennsylvania with a current status of withdrawn.

8.8 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameWheatland 12 kV
Queue IDAE1-029
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity8.8 MW
StatePennsylvania
CountyMercer
Point of interconnection—
Requested (queue) date2018-05-30
Proposed in-service date2019-03-01
Operational date—
Withdrawn date2019-06-19
Developer—
Utility / transmission ownerATSI

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.