Wheelabrator Concord Facility (50873_GEN1)

Wheelabrator Concord Facility is a 14.0 MW other interconnection project in Merrimack, New Hampshire with a current status of operational.

14.0 MWCapacity
OperationalStatus
ISNEMarket
OtherTechnology

Project facts

Canonical nameWheelabrator Concord Facility
Queue ID50873_GEN1
Statusoperational
Source status(OP) Operating
MarketISNE
TechnologyOther
Capacity14.0 MW
StateNew Hampshire
CountyMerrimack
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date1989-04-01
Withdrawn date—
Developer—
Utility / transmission ownerWheelabrator Environmental Systems

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-11

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.