Wheeler Dam (49_1)
Wheeler Dam is a 35.1 MW other interconnection project in Lawrence, Alabama with a current status of operational.
35.1 MWCapacity
OperationalStatus
TVAMarket
OtherTechnology
Project facts
| Canonical name | Wheeler Dam |
|---|---|
| Queue ID | 49_1 |
| Status | operational |
| Source status | (OP) Operating |
| Market | TVA |
| Technology | Other |
| Capacity | 35.1 MW |
| State | Alabama |
| County | Lawrence |
| Point of interconnection | — |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | 1936-11-01 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Tennessee Valley Authority |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-02 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27
Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata