Whitefish In-Line Hydroelectric Project (G0469)

Whitefish In-Line Hydroelectric Project is a 1.0 MW other interconnection project in Flathead, Montana with a current status of operational. It is proposed to connect at BPA's Flathead Substation.

1.0 MWCapacity
OperationalStatus
MTMarket
OtherTechnology

Project facts

Canonical nameWhitefish In-Line Hydroelectric Project
Queue IDG0469
Statusoperational
Source statusENERGIZED
MarketMT
TechnologyOther
Capacity1.0 MW
StateMontana
CountyFlathead
Point of interconnectionBPA's Flathead Substation
Requested (queue) date2012-01-27
Proposed in-service date
Operational date2012-08-07
Withdrawn date
DeveloperCity of Whitefish, Montana
Utility / transmission ownerBonneville Power Administration

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata