Whitten - Ochoe 115 kV (GEN-2017-093)

Whitten - Ochoe 115 kV is a 99.0 MW solar interconnection project in Lea County, New Mexico with a current status of withdrawn. It is proposed to connect at Whitten - Ochoe 115 kV.

99.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameWhitten - Ochoe 115 kV
Queue IDGEN-2017-093
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity99.0 MW
StateNew Mexico
CountyLea County
Point of interconnectionWhitten - Ochoe 115 kV
Requested (queue) date2017-05-24
Proposed in-service date
Operational date
Withdrawn date2018-06-27
Developer
Utility / transmission ownerSPS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata