Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert) (J683)

Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert) is a 50.0 MW solar interconnection project in West Baton Rouge Parish, Louisiana with a current status of operational. It is proposed to connect at Wilbert - Livonia 138kV Substation (~1.5 mi from Wilbert).

50.0 MWCapacity
OperationalStatus
Market
SolarTechnology

Project facts

Canonical nameWilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)
Queue IDJ683
Statusoperational
Source statusDone
Market
TechnologySolar
Capacity50.0 MW
StateLouisiana
CountyWest Baton Rouge Parish
Point of interconnectionWilbert - Livonia 138kV Substation (~1.5 mi from Wilbert)
Requested (queue) date2016-07-11
Proposed in-service date2018-02-28
Operational date2018-02-28
Withdrawn date
Developer
Utility / transmission ownerENTERGY ARKANSAS

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectoperationalhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: MISO — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata