Winco 9.5 MW is a 9.5 MW other interconnection project with a current status of active. It is proposed to connect at Ellensburg Substation.

9.5 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameWinco 9.5 MW
Queue IDL0678
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity9.5 MW
State
CountyKittitas
Point of interconnectionEllensburg Substation
Requested (queue) date2025-12-15
Proposed in-service date2028-12-18
Operational date
Withdrawn date
DeveloperCity of Ellensburg
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata