Wind Alternative (see 272) (302)

Wind Alternative (see 272) is a 150.0 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at BHE/MEPCO Line.

150.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind Alternative (see 272)
Queue ID302
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity150.0 MW
StateMaine
CountyAroostook
Point of interconnectionBHE/MEPCO Line
Requested (queue) date2009-06-16
Proposed in-service date2012-12-31
Operational date
Withdrawn date2011-04-26
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata