Wind Alternative (see 272) (302)
Wind Alternative (see 272) is a 150.0 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at BHE/MEPCO Line.
150.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Wind Alternative (see 272) |
|---|---|
| Queue ID | 302 |
| Status | withdrawn |
| Source status | W |
| Market | BHE |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Maine |
| County | Aroostook |
| Point of interconnection | BHE/MEPCO Line |
| Requested (queue) date | 2009-06-16 |
| Proposed in-service date | 2012-12-31 |
| Operational date | — |
| Withdrawn date | 2011-04-26 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata