Wind CNR (1388)

Wind CNR is a 61.2 MW wind interconnection project in Penobscot, Maine with a current status of operational. It is proposed to connect at Keene Rd Substation via through a 115kV Line 55 & Line 56 from Rollins Mountain115/34.5kV.

61.2 MWCapacity
OperationalStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind CNR
Queue ID1388
Statusoperational
Source statusC
MarketBHE
TechnologyWind
Capacity61.2 MW
StateMaine
CountyPenobscot
Point of interconnectionKeene Rd Substation via through a 115kV Line 55 & Line 56 from Rollins Mountain115/34.5kV
Requested (queue) date2023-04-28
Proposed in-service date
Operational date2026-04-09
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata