Wind CNR (1390)

Wind CNR is a 34.5 MW wind interconnection project in Hancock, Maine with a current status of withdrawn. It is proposed to connect at Bull Hill 115 kV Switching Station.

34.5 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind CNR
Queue ID1390
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity34.5 MW
StateMaine
CountyHancock
Point of interconnectionBull Hill 115 kV Switching Station
Requested (queue) date2023-04-28
Proposed in-service date2023-11-01
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.