Wind CNR (410)

Wind CNR is a 48.0 MW wind interconnection project in Peneobscot/Washington, Maine with a current status of withdrawn. It is proposed to connect at BHE Keene Rd.

48.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind CNR
Queue ID410
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity48.0 MW
StateMaine
CountyPeneobscot/Washington
Point of interconnectionBHE Keene Rd
Requested (queue) date2013-02-28
Proposed in-service date2016-08-01
Operational date
Withdrawn date2014-08-25
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata