Wind CNR (410)
Wind CNR is a 48.0 MW wind interconnection project in Peneobscot/Washington, Maine with a current status of withdrawn. It is proposed to connect at BHE Keene Rd.
48.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Wind CNR |
|---|---|
| Queue ID | 410 |
| Status | withdrawn |
| Source status | W |
| Market | BHE |
| Technology | Wind |
| Capacity | 48.0 MW |
| State | Maine |
| County | Peneobscot/Washington |
| Point of interconnection | BHE Keene Rd |
| Requested (queue) date | 2013-02-28 |
| Proposed in-service date | 2016-08-01 |
| Operational date | — |
| Withdrawn date | 2014-08-25 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.