Wind Farm (296)
Wind Farm is a 12.0 MW wind interconnection project in Chittenden, Vermont with a current status of withdrawn. It is proposed to connect at CVPS 34.5 kV Fairfax - Milton line.
12.0 MWCapacity
WithdrawnStatus
VTMarket
WindTechnology
Project facts
| Canonical name | Wind Farm |
|---|---|
| Queue ID | 296 |
| Status | withdrawn |
| Source status | W |
| Market | VT |
| Technology | Wind |
| Capacity | 12.0 MW |
| State | Vermont |
| County | Chittenden |
| Point of interconnection | CVPS 34.5 kV Fairfax - Milton line |
| Requested (queue) date | 2009-02-23 |
| Proposed in-service date | 2010-12-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata