Wind Increase (399)

Wind Increase is a 1.2 MW wind interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at CMP Ludden Lane Substation.

1.2 MWCapacity
WithdrawnStatus
MEMarket
WindTechnology

Project facts

Canonical nameWind Increase
Queue ID399
Statuswithdrawn
Source statusW
MarketME
TechnologyWind
Capacity1.2 MW
StateMaine
CountyFranklin
Point of interconnectionCMP Ludden Lane Substation
Requested (queue) date2012-10-01
Proposed in-service date2014-08-15
Operational date
Withdrawn date2013-02-27
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata