Wind Increase (see QP290) (323)

Wind Increase (see QP290) is a 2.0 MW wind interconnection project in Oxford, Maine with a current status of withdrawn. It is proposed to connect at CMP Woodstock Substation.

2.0 MWCapacity
WithdrawnStatus
MEMarket
WindTechnology

Project facts

Canonical nameWind Increase (see QP290)
Queue ID323
Statuswithdrawn
Source statusW
MarketME
TechnologyWind
Capacity2.0 MW
StateMaine
CountyOxford
Point of interconnectionCMP Woodstock Substation
Requested (queue) date2010-01-21
Proposed in-service date2010-12-30
Operational date
Withdrawn date2010-07-29
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata