Wind (305)

Wind is a 66.0 MW wind interconnection project in Grafton/Merrimack, New Hampshire with a current status of withdrawn. It is proposed to connect at Pemigewassett 115 kV Substation.

66.0 MWCapacity
WithdrawnStatus
NHMarket
WindTechnology

Project facts

Canonical nameWind
Queue ID305
Statuswithdrawn
Source statusW
MarketNH
TechnologyWind
Capacity66.0 MW
StateNew Hampshire
CountyGrafton/Merrimack
Point of interconnectionPemigewassett 115 kV Substation
Requested (queue) date2009-07-10
Proposed in-service date2012-12-31
Operational date
Withdrawn date2011-07-29
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata