Wind is a 74.3 MW wind interconnection project in Merrimack/Grafton, New Hampshire with a current status of withdrawn. It is proposed to connect at A201 Comerford - North Litchfield 230 kV line.

74.3 MWCapacity
WithdrawnStatus
NHMarket
WindTechnology

Project facts

Canonical nameWind
Queue ID423
Statuswithdrawn
Source statusW
MarketNH
TechnologyWind
Capacity74.3 MW
StateNew Hampshire
CountyMerrimack/Grafton
Point of interconnectionA201 Comerford - North Litchfield 230 kV line
Requested (queue) date2013-09-10
Proposed in-service date2016-12-31
Operational date
Withdrawn date2014-03-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.