Wind (458)

Wind is a 104.0 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Pittsfield 345KV.

104.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind
Queue ID458
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity104.0 MW
StateMaine
CountyAroostook
Point of interconnectionPittsfield 345KV
Requested (queue) date2014-04-28
Proposed in-service date2020-12-30
Operational date
Withdrawn date2018-04-12
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.