Wind (471)
Wind is a 600.6 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line.
600.6 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology
Project facts
| Canonical name | Wind |
|---|---|
| Queue ID | 471 |
| Status | withdrawn |
| Source status | W |
| Market | BHE |
| Technology | Wind |
| Capacity | 600.6 MW |
| State | Maine |
| County | Aroostook |
| Point of interconnection | Primary: Orrington Substations 345kV with two alternatives: Keene Rd. Substation 345kV and the Orrington-Albion Rd 345kV line |
| Requested (queue) date | 2014-06-19 |
| Proposed in-service date | 2019-12-30 |
| Operational date | — |
| Withdrawn date | 2018-04-12 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata