Wind (672)

Wind is a 630.0 MW wind interconnection project in Aroostook, Maine with a current status of withdrawn. It is proposed to connect at NSTAR 345 kV K Street substation..

630.0 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind
Queue ID672
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity630.0 MW
StateMaine
CountyAroostook
Point of interconnectionNSTAR 345 kV K Street substation.
Requested (queue) date2017-07-26
Proposed in-service date2022-12-31
Operational date
Withdrawn date2019-10-22
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.