Wind (744)
Wind is a 150.0 MW wind interconnection project in Franklin, Maine with a current status of withdrawn. It is proposed to connect at Approximate location of the proposed Point of Interconnection is the CMP Avangrid Larrabee Road 345 kV Substation.
150.0 MWCapacity
WithdrawnStatus
MEMarket
WindTechnology
Project facts
| Canonical name | Wind |
|---|---|
| Queue ID | 744 |
| Status | withdrawn |
| Source status | W |
| Market | ME |
| Technology | Wind |
| Capacity | 150.0 MW |
| State | Maine |
| County | Franklin |
| Point of interconnection | Approximate location of the proposed Point of Interconnection is the CMP Avangrid Larrabee Road 345 kV Substation |
| Requested (queue) date | 2018-04-12 |
| Proposed in-service date | 2022-12-01 |
| Operational date | — |
| Withdrawn date | 2019-02-07 |
| Developer | — |
| Utility / transmission owner | ISO-NE |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata