Wind Project-Phase 1( MPS Queue # 6) (225)

Wind Project-Phase 1( MPS Queue # 6) is a 53.4 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Maine Public Service System, upgrades include tap.

53.4 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWind Project-Phase 1( MPS Queue # 6)
Queue ID225
Statuswithdrawn
Source statusW
Market
TechnologyWind
Capacity53.4 MW
State
County
Point of interconnectionMaine Public Service System, upgrades include tap
Requested (queue) date2007-09-04
Proposed in-service date2010-09-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata