Wind Project-Phase 1( MPS Queue # 6) is a 53.4 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Maine Public Service System, upgrades include tap.
53.4 MWCapacity
WithdrawnStatus
—Market
WindTechnology
Project facts
| Canonical name | Wind Project-Phase 1( MPS Queue # 6) |
|---|---|
| Queue ID | 225 |
| Status | withdrawn |
| Source status | W |
| Market | — |
| Technology | Wind |
| Capacity | 53.4 MW |
| State | — |
| County | — |
| Point of interconnection | Maine Public Service System, upgrades include tap |
| Requested (queue) date | 2007-09-04 |
| Proposed in-service date | 2010-09-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | ISO-NE |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.