Wind Project-Phase 2( MPS Queue # 2&3) (168)

Wind Project-Phase 2( MPS Queue # 2&3) is a 250.0 MW wind interconnection project with a current status of withdrawn. It is proposed to connect at Maine Public Service System, upgrades include tap.

250.0 MWCapacity
WithdrawnStatus
Market
WindTechnology

Project facts

Canonical nameWind Project-Phase 2( MPS Queue # 2&3)
Queue ID168
Statuswithdrawn
Source statusW
Market
TechnologyWind
Capacity250.0 MW
State
County
Point of interconnectionMaine Public Service System, upgrades include tap
Requested (queue) date2006-08-11
Proposed in-service date2012-09-30
Operational date
Withdrawn date2009-09-16
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.