Wind Repower (1464)

Wind Repower is a 35.2 MW wind interconnection project in Caledonia, Vermont with a current status of withdrawn. It is proposed to connect at VELCO, 115kV, Sheffield Substation 44.663509, -72.123160.

35.2 MWCapacity
WithdrawnStatus
VTMarket
WindTechnology

Project facts

Canonical nameWind Repower
Queue ID1464
Statuswithdrawn
Source statusW
MarketVT
TechnologyWind
Capacity35.2 MW
StateVermont
CountyCaledonia
Point of interconnectionVELCO, 115kV, Sheffield Substation 44.663509, -72.123160
Requested (queue) date2023-12-05
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-10-11
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata