Wind River - Plymouth 230 kV (L0685)

Wind River - Plymouth 230 kV is a 800.0 MW other interconnection project with a current status of active. It is proposed to connect at McNary-John Day No. 2 500 kV line.

800.0 MWCapacity
ActiveStatus
Market
OtherTechnology

Project facts

Canonical nameWind River - Plymouth 230 kV
Queue IDL0685
Statusactive
Source statusSTUDY
Market
TechnologyOther
Capacity800.0 MW
State
CountyBenton
Point of interconnectionMcNary-John Day No. 2 500 kV line
Requested (queue) date2026-02-10
Proposed in-service date2029-02-01
Operational date
Withdrawn date
DeveloperBenton Rural Electric Association
Utility / transmission ownerBonneville Power Administration

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata