Wind uprate is a 2.9 MW wind interconnection project in Penobscot, Maine with a current status of withdrawn. It is proposed to connect at Existing connection between Emera Maine 115kV lines 64 and 97.

2.9 MWCapacity
WithdrawnStatus
BHEMarket
WindTechnology

Project facts

Canonical nameWind uprate
Queue ID547
Statuswithdrawn
Source statusW
MarketBHE
TechnologyWind
Capacity2.9 MW
StateMaine
CountyPenobscot
Point of interconnectionExisting connection between Emera Maine 115kV lines 64 and 97
Requested (queue) date2015-04-28
Proposed in-service date2018-12-31
Operational date
Withdrawn date2018-05-31
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata