Windy Point 1 Wind (G122)
Windy Point 1 Wind is a 125.0 MW wind interconnection project in Klickitat, Washington with a current status of operational. It is proposed to connect at Rock Creek 230kV.
125.0 MWCapacity
OperationalStatus
WAMarket
WindTechnology
Project facts
| Canonical name | Windy Point 1 Wind |
|---|---|
| Queue ID | G122 |
| Status | operational |
| Source status | ENERGIZED |
| Market | WA |
| Technology | Wind |
| Capacity | 125.0 MW |
| State | Washington |
| County | Klickitat |
| Point of interconnection | Rock Creek 230kV |
| Requested (queue) date | 2004-01-16 |
| Proposed in-service date | — |
| Operational date | 2009-07-01 |
| Withdrawn date | — |
| Developer | Cannon Power Corporation |
| Utility / transmission owner | Bonneville Power Administration |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: bpa-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata