Woodbourne (G13)

Woodbourne is a 600.0 MW gas interconnection project in Bucks, Pennsylvania with a current status of withdrawn.

600.0 MWCapacity
WithdrawnStatus
—Market
GasTechnology

Project facts

Canonical nameWoodbourne
Queue IDG13
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyGas
Capacity600.0 MW
StatePennsylvania
CountyBucks
Point of interconnection—
Requested (queue) date2001-03-22
Proposed in-service date2005-12-01
Operational date—
Withdrawn date2003-06-03
Developer—
Utility / transmission ownerPECO

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-10-11
Data last materially changed2026-10-11
Page data generated2026-10-11

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.