Woonsocket Substation – Tifft ST BESS is a 4.5 MW battery interconnection project in Providence, Rhode Island with a current status of withdrawn. It is proposed to connect at RIE feeder 26W7, Woonsocket Substation.

4.5 MWCapacity
WithdrawnStatus
RIMarket
BatteryTechnology

Project facts

Canonical nameWoonsocket Substation – Tifft ST BESS
Queue ID1594
Statuswithdrawn
Source statusW
MarketRI
TechnologyBattery
Capacity4.5 MW
StateRhode Island
CountyProvidence
Point of interconnectionRIE feeder 26W7, Woonsocket Substation
Requested (queue) date2024-11-15
Proposed in-service date2026-12-31
Operational date
Withdrawn date2025-06-13
Developer
Utility / transmission ownerISO-NE

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata