WY Queue Project 2004-G8 — Wind in Yuma County, Wyoming

WY Queue Project 2004-G8 — Wind in Yuma County, Wyoming is a 102.0 MW wind interconnection project in Yuma County, Wyoming with a current status of withdrawn. It is proposed to connect at Wauneta Substation 115-kV.

102.0 MWCapacity
WithdrawnStatus
WYMarket
WindTechnology

Project facts

Canonical nameWY Queue Project 2004-G8 — Wind in Yuma County, Wyoming
Queue ID2004-G8
Statuswithdrawn
Source statusWithdrawn
MarketWY
TechnologyWind
Capacity102.0 MW
StateWyoming
CountyYuma County
Point of interconnectionWauneta Substation 115-kV
Requested (queue) date2004-11-01
Proposed in-service date2009-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata