WY Queue Project 2010-G2 — Wind in Platte County, Wyoming
WY Queue Project 2010-G2 — Wind in Platte County, Wyoming is a 200.0 MW wind interconnection project in Platte County, Wyoming with a current status of withdrawn. It is proposed to connect at Archer 230-kV Sub.
200.0 MWCapacity
WithdrawnStatus
WYMarket
WindTechnology
Project facts
| Canonical name | WY Queue Project 2010-G2 — Wind in Platte County, Wyoming |
|---|---|
| Queue ID | 2010-G2 |
| Status | withdrawn |
| Source status | Withdrawn |
| Market | WY |
| Technology | Wind |
| Capacity | 200.0 MW |
| State | Wyoming |
| County | Platte County |
| Point of interconnection | Archer 230-kV Sub |
| Requested (queue) date | 2010-01-29 |
| Proposed in-service date | 2011-03-31 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Western Area Power Administration - Rocky Mountain Region |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.