WY Queue Project 2017-G4 — Wind in Niobrara/Converse County, Wyoming

WY Queue Project 2017-G4 — Wind in Niobrara/Converse County, Wyoming is a 140.0 MW wind interconnection project in Niobrara/Converse County, Wyoming with a current status of withdrawn. It is proposed to connect at Glendo - Podolak 115-kV.

140.0 MWCapacity
WithdrawnStatus
WYMarket
WindTechnology

Project facts

Canonical nameWY Queue Project 2017-G4 — Wind in Niobrara/Converse County, Wyoming
Queue ID2017-G4
Statuswithdrawn
Source statusWithdrawn
MarketWY
TechnologyWind
Capacity140.0 MW
StateWyoming
CountyNiobrara/Converse County
Point of interconnectionGlendo - Podolak 115-kV
Requested (queue) date2017-04-07
Proposed in-service date2020-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata