WY Queue Project 2019-G4 — Solar in Albany County, Wyoming

WY Queue Project 2019-G4 — Solar in Albany County, Wyoming is a 160.0 MW solar interconnection project in Albany County, Wyoming with a current status of withdrawn. It is proposed to connect at Snowy Range 230-kV.

160.0 MWCapacity
WithdrawnStatus
WYMarket
SolarTechnology

Project facts

Canonical nameWY Queue Project 2019-G4 — Solar in Albany County, Wyoming
Queue ID2019-G4
Statuswithdrawn
Source statusWithdrawn
MarketWY
TechnologySolar
Capacity160.0 MW
StateWyoming
CountyAlbany County
Point of interconnectionSnowy Range 230-kV
Requested (queue) date2019-03-04
Proposed in-service date2022-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.