WY Queue Project 2022-G8 — Solar+Battery in Laramie County, Wyoming is a 421.4 MW solar+battery interconnection project in Laramie County, Wyoming with a current status of withdrawn. It is proposed to connect at Terry Ranch 230-kV Substation.

421.4 MWCapacity
WithdrawnStatus
WYMarket
Solar+BatteryTechnology

Project facts

Canonical nameWY Queue Project 2022-G8 — Solar+Battery in Laramie County, Wyoming
Queue ID2022-G8
Statuswithdrawn
Source statusWithdrawn
MarketWY
TechnologySolar+Battery
Capacity421.4 MW
StateWyoming
CountyLaramie County
Point of interconnectionTerry Ranch 230-kV Substation
Requested (queue) date2022-07-05
Proposed in-service date2025-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-28

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata