WY Queue Project 2023-G8 — Solar in Laramie, Wyoming

WY Queue Project 2023-G8 — Solar in Laramie, Wyoming is a 400.0 MW solar interconnection project in Laramie, Wyoming with a current status of withdrawn. It is proposed to connect at Miracle Mile 230kV.

400.0 MWCapacity
WithdrawnStatus
WYMarket
SolarTechnology

Project facts

Canonical nameWY Queue Project 2023-G8 — Solar in Laramie, Wyoming
Queue ID2023-G8
Statuswithdrawn
Source statusWithdrawn
MarketWY
TechnologySolar
Capacity400.0 MW
StateWyoming
CountyLaramie
Point of interconnectionMiracle Mile 230kV
Requested (queue) date2023-09-27
Proposed in-service date2027-12-14
Operational date
Withdrawn date
Developer
Utility / transmission ownerWestern Area Power Administration - Rocky Mountain Region

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: wapa-rm-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata