WY Queue Project PIS002 — Wind in Carbon, Wyoming

WY Queue Project PIS002 — Wind in Carbon, Wyoming is a 400.0 MW wind interconnection project in Carbon, Wyoming with a current status of operational. It is proposed to connect at Aeolus substation.

400.0 MWCapacity
OperationalStatus
WYMarket
WindTechnology

Project facts

Canonical nameWY Queue Project PIS002 — Wind in Carbon, Wyoming
Queue IDPIS002
Statusoperational
Source statusIn Service
MarketWY
TechnologyWind
Capacity400.0 MW
StateWyoming
CountyCarbon
Point of interconnectionAeolus substation
Requested (queue) date2021-09-16
Proposed in-service date
Operational date2025-10-15
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata