WY Queue Project PIS005 — Gas in Lincoln, Wyoming

WY Queue Project PIS005 — Gas in Lincoln, Wyoming is a 48.0 MW gas interconnection project in Lincoln, Wyoming with a current status of operational. It is proposed to connect at Naughton substation.

48.0 MWCapacity
OperationalStatus
WYMarket
GasTechnology

Project facts

Canonical nameWY Queue Project PIS005 — Gas in Lincoln, Wyoming
Queue IDPIS005
Statusoperational
Source statusIn Service
MarketWY
TechnologyGas
Capacity48.0 MW
StateWyoming
CountyLincoln
Point of interconnectionNaughton substation
Requested (queue) date2022-05-12
Proposed in-service date
Operational date2023-07-03
Withdrawn date
Developer
Utility / transmission ownerPacifiCorp

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-03new_projectoperationalhigh

Explore related data

Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27

Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata