WY Queue Project PIS005 — Gas in Lincoln, Wyoming
WY Queue Project PIS005 — Gas in Lincoln, Wyoming is a 48.0 MW gas interconnection project in Lincoln, Wyoming with a current status of operational. It is proposed to connect at Naughton substation.
48.0 MWCapacity
OperationalStatus
WYMarket
GasTechnology
Project facts
| Canonical name | WY Queue Project PIS005 — Gas in Lincoln, Wyoming |
|---|---|
| Queue ID | PIS005 |
| Status | operational |
| Source status | In Service |
| Market | WY |
| Technology | Gas |
| Capacity | 48.0 MW |
| State | Wyoming |
| County | Lincoln |
| Point of interconnection | Naughton substation |
| Requested (queue) date | 2022-05-12 |
| Proposed in-service date | — |
| Operational date | 2023-07-03 |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | operational | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata