WY Queue Project PIS089 — Wind in Lincoln, Wyoming
WY Queue Project PIS089 — Wind in Lincoln, Wyoming is a 400.0 MW wind interconnection project in Lincoln, Wyoming with a current status of active. It is proposed to connect at Naughton-Ben Lomond #2 transmission line.
400.0 MWCapacity
ActiveStatus
WYMarket
WindTechnology
Project facts
| Canonical name | WY Queue Project PIS089 — Wind in Lincoln, Wyoming |
|---|---|
| Queue ID | PIS089 |
| Status | active |
| Source status | In Progress |
| Market | WY |
| Technology | Wind |
| Capacity | 400.0 MW |
| State | Wyoming |
| County | Lincoln |
| Point of interconnection | Naughton-Ben Lomond #2 transmission line |
| Requested (queue) date | 2024-10-31 |
| Proposed in-service date | 2028-10-01 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | PacifiCorp |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-03 | new_project | — | active | high |
Explore related data
Source last checked2026-08-24
Data last materially changed2026-08-24
Page data generated2026-08-27
Provenance: pacificorp-oasis. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata