Wye Mills 25 kV (AE1-048)

Wye Mills 25 kV is a 1.0 MW battery interconnection project in Queen Anne's, Maryland with a current status of withdrawn.

1.0 MWCapacity
WithdrawnStatus
—Market
BatteryTechnology

Project facts

Canonical nameWye Mills 25 kV
Queue IDAE1-048
Statuswithdrawn
Source statusWithdrawn
Market—
TechnologyBattery
Capacity1.0 MW
StateMaryland
CountyQueen Anne's
Point of interconnection—
Requested (queue) date2018-07-17
Proposed in-service date—
Operational date—
Withdrawn date2018-08-09
Developer—
Utility / transmission ownerDPL

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_project—withdrawnhigh

Explore related data

Source last checked2026-11-26
Data last materially changed2026-11-26
Page data generated2026-11-26

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata