Wygen 2 (56319_0001)

Wygen 2 is a 95.0 MW other interconnection project in Campbell, Wyoming with a current status of operational.

95.0 MWCapacity
OperationalStatus
WACMMarket
OtherTechnology

Project facts

Canonical nameWygen 2
Queue ID56319_0001
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyOther
Capacity95.0 MW
StateWyoming
CountyCampbell
Point of interconnection—
Requested (queue) date—
Proposed in-service date—
Operational date2008-01-01
Withdrawn date—
Developer—
Utility / transmission ownerBlack Hills Cheyenne Light Fuel and Power Transmission

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_project—operationalhigh

Explore related data

Source last checked2026-10-02
Data last materially changed2026-10-02
Page data generated2026-10-12

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.