Wygen III (56596_5)

Wygen III is a 116.0 MW other interconnection project in Campbell, Wyoming with a current status of operational.

116.0 MWCapacity
OperationalStatus
WACMMarket
OtherTechnology

Project facts

Canonical nameWygen III
Queue ID56596_5
Statusoperational
Source status(OP) Operating
MarketWACM
TechnologyOther
Capacity116.0 MW
StateWyoming
CountyCampbell
Point of interconnection
Requested (queue) date
Proposed in-service date
Operational date2010-04-01
Withdrawn date
Developer
Utility / transmission ownerBlack Hills Cheyenne Light Fuel and Power Transmission

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-02new_projectoperationalhigh

Explore related data

Source last checked2026-08-03
Data last materially changed2026-08-03
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata