Wyman Hydro CNR only (483)

Wyman Hydro CNR only is a 89.9 MW other interconnection project in Somerset, Maine with a current status of operational. It is proposed to connect at Interconnection of Buyer’s 115 kV gang operated disconnect switch BS ½ to CMP’s 115 kV Bus No. 2 located in the 115 kV switchyard.

89.9 MWCapacity
OperationalStatus
MEMarket
OtherTechnology

Project facts

Canonical nameWyman Hydro CNR only
Queue ID483
Statusoperational
Source statusC
MarketME
TechnologyOther
Capacity89.9 MW
StateMaine
CountySomerset
Point of interconnectionInterconnection of Buyer’s 115 kV gang operated disconnect switch BS ½ to CMP’s 115 kV Bus No. 2 located in the 115 kV switchyard
Requested (queue) date2014-11-21
Proposed in-service date
Operational date2016-03-30
Withdrawn date
Developer
Utility / transmission ownerISO-NE

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: isone-irtt. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata