Yonkers Grid, LLC (0803)

Yonkers Grid, LLC is a 100.0 MW battery interconnection project in Westchester, New York with a current status of withdrawn. It is proposed to connect at Dunwoodie - 138kV North Substation.

100.0 MWCapacity
WithdrawnStatus
IMarket
BatteryTechnology

Project facts

Canonical nameYonkers Grid, LLC
Queue ID0803
Statuswithdrawn
Source status0
MarketI
TechnologyBattery
Capacity100.0 MW
StateNew York
CountyWestchester
Point of interconnectionDunwoodie - 138kV North Substation
Requested (queue) date2019-03-11
Proposed in-service date2023-09-30
Operational date
Withdrawn date
DeveloperYonkers Grid, LLC
Utility / transmission ownerCONED

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: New York ISO — interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata