York 115kV (U1-068)

York 115kV is a 10.0 MW gas interconnection project in Lancaster, Pennsylvania with a current status of withdrawn.

10.0 MWCapacity
WithdrawnStatus
Market
GasTechnology

Project facts

Canonical nameYork 115kV
Queue IDU1-068
Statuswithdrawn
Source statusDeactivated
Market
TechnologyGas
Capacity10.0 MW
StatePennsylvania
CountyLancaster
Point of interconnection
Requested (queue) date2008-04-14
Proposed in-service date2011-02-28
Operational date
Withdrawn date
Developer
Utility / transmission ownerME

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-29new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-27
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: PJM — new-services interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.