Zia 115kV, bus 528420 (ASGI-2014-011)

Zia 115kV, bus 528420 is a 10.0 MW solar interconnection project in Lea County, New Mexico with a current status of withdrawn. It is proposed to connect at Zia 115kV, bus 528420.

10.0 MWCapacity
WithdrawnStatus
NMMarket
SolarTechnology

Project facts

Canonical nameZia 115kV, bus 528420
Queue IDASGI-2014-011
Statuswithdrawn
Source statusWITHDRAWN
MarketNM
TechnologySolar
Capacity10.0 MW
StateNew Mexico
CountyLea County
Point of interconnectionZia 115kV, bus 528420
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerSPS

What changed

ObservedFieldOld valueNew valueMateriality
2026-07-31new_project—withdrawnhigh

Explore related data

Source last checked2026-10-12
Data last materially changed2026-10-12
Page data generated2026-10-12

Provenance: Southwest Power Pool — generator interconnection queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata