The interXdata warehouse tracks 8 interconnection projects in Talladega, Alabama, representing 653 MW of requested capacity.

8Total projects
2Active
6Operational
0Withdrawn
653 MWRequested capacity

Technology mix

TechnologyProjectsRequested capacity
Battery1200 MW
Solar1200 MW
Other4154 MW
Gas299 MW

Projects

ProjectQueue IDTechnologyCapacityStatusLocation
Dega Solar and Storage68332_DEGA2Battery200.0 MWactiveTalladega, Alabama
Dega Solar and Storage68332_DEGA1Solar200.0 MWactiveTalladega, Alabama
AMEA Peaking56018_1Gas49.3 MWoperationalTalladega, Alabama
AMEA Peaking56018_2Gas49.3 MWoperationalTalladega, Alabama
Logan Martin Dam14_3Other42.7 MWoperationalTalladega, Alabama
Logan Martin Dam14_1Other42.7 MWoperationalTalladega, Alabama
Logan Martin Dam14_2Other42.7 MWoperationalTalladega, Alabama
U S Alliance Coosa Pines54216_GEN7Other25.9 MWoperationalTalladega, Alabama

Top developers

Developer attribution is not yet resolved for this set.

Explore related data

Source last checked2026-07-31
Data last materially changed2026-08-27
Page data generated2026-08-27

Provenance: U.S. EIA — Form EIA-860M generator inventory (operating + planned). Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Get an alert when a new project is proposed in Talladega County.